Employee work schedule: week, month, assignments
How to read the schedule grid with hours, select days, assign a week template, copy a schedule and enter leave or a sick day as one event for a date range.
For roles:OwnerAdministratorManager
Screen overview in words
What this page covers: How to read the grid · Selecting days · Assign a schedule · Leave in one action
The Schedule page shows a week or a month: employees in rows, days in columns. A cell holds the plan, for example nine in the morning to six in the evening, and the number of hours. In the first column, under the name, you see the total for the period.
To assign a schedule, drag across cells, or click an employee's name to select the whole row. An action bar appears at the bottom. Press “Assign schedule”, choose a week template and the date until which it applies. If the template does not exist yet, you can create it right in the list.
For leave or a sick day, select the days and press the matching button. One event is created for the whole range.
You can copy a schedule too: copy one employee's cells, select others and press “Paste”.
On this page
/workers-schedule/scheduleWho it is for: a manager and an administrator build the schedule, the owner sees who works when.
Why this screen matters
This is where work is planned: who comes in, when and on which template. The grid combines the plan from templates, leave, replacements, club closures and the actual shifts worked. At a glance you see the days with nobody on shift, how many hours each person has for the period and who has no schedule.
It is step 1 of the monthly routine: the timesheet, absences and pay all depend on it.
What is on the screen
Header
- Week or month arrows and the Today button
- A Week / Month switch. Week shows hours in large type, month compresses the cells
- Find employee search and the Only with a schedule switch
- The Assignments list link and the refresh button
Grid
- Row: avatar, name, a total such as “168 h · 21 shifts” or “No schedule”
- Column: the date and weekday; today is highlighted
- Cell: the template's colour bar, a time such as “09:00–18:00” and the number of hours
- The bottom row On shift: how many people are planned to work that day (a red zero if nobody)
Above the grid
- The “Step 1 of 5 · Schedule” bar with the state of all steps
- A hint: drag or Shift+click to select days; a click on a name selects a row, a click on a date a column; Esc clears the selection
What the marks in a cell mean
| Mark | Meaning |
|---|---|
| A time and a number of hours | The plan from the template. The colour of the bar matches the template's colour |
| An event label (“Vacation”, “Sick leave”) | A schedule event overlays the plan. If the event blocks work, the plan is struck through |
| “↔ being replaced” or “↔ substitute” | The employee is replaced that day, or is covering for a colleague |
| Diagonal hatching | The club is closed |
| A dot in the corner | The fact of the shift: working now, worked, absence (red), auto-closed or without a schedule (yellow) |
The “On shift” total does not count leave or closures.
Actions on the screen
When you select cells, a bar appears at the bottom: the names (or “N employees”), the range of dates and the number of days. Clear the selection with the cross in the corner of the bar or with the Esc key.
How to assign a week template
- Drag across the cells of the employees and days you need. For a long range, click the first cell and then Shift+click the last. A click on a name selects the whole row.
- In the bar press Assign schedule. The Pick a week template field opens.
- Choose a template. If the one you need does not exist, the list has a “+ New template” item: give it a name and a preset without leaving the page. Fine-tune the hours later in Week templates.
- In the Valid until field choose the last selected day, Until month end or Open-ended.
- Read the summary: “Assign from … to …: N employees”. If a yellow line “Existing assignments to be changed: N” stands next to it, the system will shorten or split assignments that already apply on those dates.
- Press Apply. “Schedule assigned: N employees” appears and the hours show in the cells at once.
If you assign a template inside an existing assignment, the system splits it. The part before the selected days keeps the old template, the new assignment covers the selected days, and what follows them is restored with the old template.
How to copy a schedule to others
- Select the cells of an employee who already has the schedule you want and press Copy schedule. You will see “Copied “…” — select other days and press “Paste””.
- Select other employees or other weeks and press the Paste “template name” button in the bar.
- Choose the date until which the schedule applies and press Apply.
The template of the first selected cell that has a plan is the one copied. If none of the selected cells has a schedule, the system says “No schedule to copy in the selected cells”.
How to enter leave or a sick day
- Select the employee's days of absence.
- In the bar press Vacation, Sick leave or Day off. For other types press Other event…, choose the Event type and Apply.
- You will see ““Vacation”: events created N”. One event is created for an unbroken range of one employee's days.
- If the type needs approval, the event becomes “Pending”, and a manager confirms it in “Leave & sick days”.
How to remove a schedule
Select the days and press Remove schedule. The system asks: “Remove the schedule from … to … for N employees? Assignments extending beyond these dates will be shortened or split.” Confirm with the Remove schedule button, and “Schedule removed: N employees” appears.
The assignments list
The Assignments list link opens a table “employee, template, period, status” with filters and the Edit and Deactivate buttons. It has no item of its own in the left menu, and the old link to this page still works. After an assignment has started, you cannot change its template, location or start date: extend or shorten the end date, or deactivate the assignment and create a new one.
Typical situations
An employee moves to another template from the 1st
Select the days from the 1st to the end of the month (click the first day, Shift+click the last), assign the new template and choose Open-ended. The old assignment is shortened to the last day before the 1st.
One schedule for the whole team
Click a date in the header to select the whole column. Shift+click the last date of the range and assign the template to all selected rows.
A trainer works in two halls
Switch the location in the CRM header and assign the template in each location separately. An assignment without a location conflicts with all of them.
When the system refuses
The system answers: «Призначення перетинається з існуючим призначенням #… (… — …)»
The assignment overlaps an existing one: the employee already has an assignment in this location on those dates that could not be shortened automatically. Open the assignments list, change the dates of the existing assignment and repeat the action.
The system answers: «Шаблон #… неактивний — призначення неактивного шаблону заборонено»
The template is inactive, and an inactive template cannot be assigned. Activate it in “Week templates” or choose another one.
The system answers: «Локація #… не входить до списку локацій шаблону #…. Дозволені локації: …»
The template works in only some locations. Add the current location to the template or choose another template.
The system answers: «Подія перетинається з існуючою подією #…»
An event is already entered for these days, and its type does not allow overlaps. Cancel the old event or change the dates.
If some assignments were saved before the error, the grid reloads and shows what managed to be written.
Who can see and do what
| Role | View | Actions |
|---|---|---|
| Owner, manager, administrator with “Employee Schedules” | The location's grid | Create assignments and events |
| With “Employee Schedules” (edit) | The same | Assign, copy and remove schedules |
| Approver (“Schedule change approval”) | The same | Confirm events |
| Trainer, cashier | The section is unavailable | The employee opens their own shift |
Frequently asked questions
Why are some employees missing from the grid?
The grid shows employees of the location chosen in the header. Also check the “Only with a schedule” switch: when it is on, employees without assignments are hidden.
Can I change the hours of a single day?
No, the grid has no such action: hours come from the template. Shorten the assignment and create a new one with another template for the days you need.
What does “No schedule” under a name mean?
The employee has no assignment in the chosen period. Select their row and assign a template.
Where do I see the actual hours?
For past days a dot with the shift status stands in the corner of the cell. The monthly hours total is in the payroll “Timesheet”.
Does the selection survive a page refresh?
No. The selection lives only on the screen: Esc or the cross in the bar clears it by hand.
Keep reading
- Week templates: build a work schedule in minutes
- Leave, sick days and replacements of employees
- Who is on shift: open, close and correct a shift
- Monthly routine: from schedule to payroll
- Employee timesheet: monthly hours for payroll
- Staff and payroll in the CRM: roles, schedules, timesheetStaff in GYMS-CRM: profiles, roles and rights, schedules and timesheets, shift reports, a payroll builder with 13 formulas, drafts, statements and tasks.
- Trainer app: a working day without a paper registerA trainer's day in the club app: start and finish classes, mark no-shows, answer personal requests, see clients. What works now and a sample daily routine.
- Trainer pay: formulas, tiers and the payroll statementHow to set up trainer payroll in a CRM: per-class rates, tiers by headcount, percentage of revenue, salary and guaranteed minimum, draft, approval, payout.
- How to calculate trainer pay: percentage, rate, mixedFour trainer pay schemes: percentage of revenue, rate per class, hourly and mixed with a guarantee. Worked examples, mistakes and automating the monthly count.