Maintenance plans, breakdowns, repairs and write-off
How to run maintenance: plans with a checklist, Maintenance done, a breakdown report with a court block, a repair with an expense, write-off and the journal.
For roles:OwnerManagerAdministrator
Screen overview in words
What this page covers: Maintenance plans with a checklist · The Maintenance done mark · Reporting a breakdown · A repair and an expense · Write-off and the journal
Maintenance plans turn "we will lubricate it sometime" into a date in the calendar. For a card you create a plan: a name, how often, the first date, the responsible person and the checklist items. For example Monthly maintenance every 30 days and Belt replacement once a year.
When maintenance is done, an employee presses Maintenance done, ticks the checklist items and, if needed, writes a note about why something was not done. The system counts the next date from the day it was done: done on the 12th with a plan of every 30 days means the next one 30 days after the 12th.
If the rule about maintenance tasks is on, the system creates a task in advance for the responsible person in the Tasks section, with the checklist.
A machine broke? Press Report a breakdown and briefly describe what happened. The status becomes Under repair. If it is a court or a lane, you can block it in the calendar at once, and clients will not book that time.
Fixed it? Record a repair: who repaired it, what was done, whether it is finished and how much it cost. The cost creates an expense Equipment repair that is then approved in expenses.
If the equipment can no longer be repaired, Write off with a mandatory reason. The history stays, but the card can no longer be changed.
On this page
/equipment-maintenanceWho this is for: the owner and the manager make plans, record repairs with a cost and write off. Technical staff and the senior administrator mark maintenance, report breakdowns and record repairs without a cost.
Why do you need these actions?
Records of cards alone are of little use. The value is in the journal: when it broke, who repaired it, how much it cost, when maintenance was done. It shows which machine "eats money", and maintenance stops depending on anyone's memory. All actions are done from the equipment card: Equipment care.
The actions are convenient from a phone: a card opened by a label shows large buttons Report a breakdown and Maintenance done on top, for the plan with the nearest date.
What is on the card?
Maintenance plans
- A name, "every N days", last and next maintenance
- The Add plan button, icons to change and delete a plan
Action buttons
- Report a breakdown, Record a repair, Maintenance done
- In the "⋮" menu: Edit, Duplicate, Print label, Write off, Delete card
Journal
- The Record type filter: All, Breakdown, Repair, Maintenance done, Write-off
- New records on top, a Show more button
Maintenance plans
A plan describes a regulation: "every N days, with this checklist". A card can have several plans, for example "Monthly maintenance" (30 days) and "Belt replacement" (365 days). Counting by machine hours is not supported: only days.
| Plan field | What it means |
|---|---|
| Plan name | Up to 150 characters, for example "Monthly maintenance" or "Lubricating the guides" |
| Interval | From 1 to 3650 days. Quick values: a week, 2 weeks, a month, a quarter, half a year, a year |
| First maintenance date | When to do the maintenance for the first time. Without a date it is today plus the interval |
| Next maintenance (move by hand) | You can move the date by hand; after "Maintenance done" it is recalculated |
| Responsible | Who does the maintenance: they get the task and the notification (if the rule is on) |
| Maintenance checklist | What to check. The items come from the directory, in list order, at most 100 items. A missing item can be created here |
| Plan is active | A switched-off plan gives no maintenance dates or tasks. You cannot switch on a plan of written-off equipment |
How do I create a maintenance plan?
- Open the equipment card, the Maintenance plans section, and press Add plan. New maintenance plan opens.
- Enter a name and choose an interval: a number of days or a quick value (Month, Quarter).
- If needed set the First maintenance date and the Responsible.
- In the Maintenance checklist field add items: Add checklist item…. The order is changed with the Up and Down buttons, an extra item is removed with Remove item.
- Save. "Maintenance plan added" appears, and the card shows the next date.
Deleting a plan removes it from the card, but the history of its execution stays in the journal.
How do I mark done maintenance?
- In the card press Maintenance done (from a phone: the large button on top). A dialog opens.
- Choose the Maintenance plan. Only active plans are shown. If there are none the system says "No active maintenance plans. Add a plan in the equipment card".
- Enter the Date done (not in the future) and, if needed, the Performer. If you leave the performer empty, it will be you.
- Tick the Checklist items (there are Mark all and Clear all marks). You can add a note to an item about why it was not done. Items without a tick are recorded as not done.
- Press Done. "Maintenance recorded. Next — date" appears: it is computed as the date done plus the interval.
If done on the 12th under a plan of "every 30 days", the next maintenance falls on the 30th day after the 12th, even if by the plan it was overdue.
Maintenance tasks
If the system rule (the Staff group) "Equipment: create maintenance tasks" is on, the system checks the plans every day and creates a task in advance for the responsible person in the Tasks section with a checklist, and also sends a notification. How many days before the date the task appears is set by the rule "Equipment: days before maintenance to create a task" (3 by default, range 0 to 60, zero means "on the day of maintenance"). A task is created once for each maintenance date. It is not closed automatically: after "Maintenance done" the performer closes the task in tasks themselves. A click on the notification about such a task opens it on the board.
By default the rule is off, and then overdue maintenance is visible in the report.
A breakdown
- In the card press Report a breakdown.
- In What happened describe the fault in your own words, for example "tears the belt at speed 12". It goes into the journal and the notification to the responsible person. The field is optional, up to 5000 characters.
- If the equipment is linked to a court or lane, a switch Block "court" in the calendar appears. Switch it on, choose the Date, Start and Duration (1 h, 2 h, 4 h, 12 h, a day or your own number of minutes from 1 to 1440).
- Press Report. "Breakdown recorded, status — Under repair" appears.
The court block is the same as in the calendar: clients will not be able to book that time. If a booking or class already exists at that time, the system says what exactly is in the way. A repeated report about already broken equipment simply adds a journal entry.
If the rule "Equipment: notify the responsible person about a breakdown" is on, the responsible person gets a notification. A click on it opens the equipment card: Notifications.
A repair
- Press Record a repair.
- In the Result field choose Repair finished (the equipment is In service again) or Work continues (it stays Under repair, for example while you wait for a part).
- Describe What was done and say Who repaired it: Contractor (from the supplier directory), Employee or Other (free text).
- If needed enter the Repair cost, ₴. The field is seen only by those who have the right to create expenses. A contractor or an employee performer is required for the expense.
- If the repair is finished and a court was blocked because of the breakdown, switch on Release the "court" block in the calendar.
- Press Record a repair. "Repair recorded, the equipment is In service again" or, with a cost, "Repair recorded, an expense was created in Expenses" appears. The Open expense button leads to it.
The cost creates an expense "Equipment repair" with the status "Planned" for that amount, in the equipment's location, for the contractor or the employee. It is then approved and paid in Expenses like an ordinary one. A double press of "Record a repair" does not create two expenses. A warranty repair is free: leave the cost empty or zero, and no expense is created.
Write-off
- In the "⋮" menu of the card choose Write off. A window with a warning opens.
- Enter the Write-off reason, for example "cracked frame, repair makes no sense". It is required, up to 5000 characters, stored in the journal and not changed.
- Press Write off. "Equipment written off" appears.
The status Written off is final: active maintenance plans switch off, and any actions and editing of the card become unavailable. The card stays in the list with its history, and a bar at the top says "Equipment written off date. The card is for viewing only".
Reports from clients
If you switch on the rule "Equipment: a client may report a breakdown", a client in the app scans the QR label (or types the code) and writes what is wrong. The entry appears in the equipment journal marked "from client" with the author's name. The status does not change: an employee checks and presses Confirm breakdown next to the entry. One client can write about the same machine no more than once a day. By default the rule is off.
The journal
The journal in the card shows all events: "Breakdown", "Repair", "Maintenance done", "Write-off". An entry shows who reported or did it, whether the court is blocked, the expense number and the number of checklist items done ("Checklist: 5 of 7").
Rules and notifications
| Rule (the Staff group) | Default |
|---|---|
| Equipment: create maintenance tasks | Off |
| Equipment: days before maintenance to create a task | 3 days (0 to 60) |
| Equipment: notify the responsible person about a breakdown | Off |
| Equipment: a client may report a breakdown | Off |
An employee can switch off the notifications of the group "Equipment care" in their own notification settings.
Typical situations
A maintenance task was created, but the maintenance was done earlier
Mark Maintenance done with the actual date. The next date is recalculated from it, and the extra task you close in Tasks.
A breakdown was reported by mistake
The status is already Under repair. Record a repair with the result "Repair finished": the equipment returns to work. The breakdown entry stays in the journal.
A warranty repair
Record the repair without a cost: no expense is created. Keep the warranty slip in the card's attached documents.
When the system refuses
The system answers: «Обладнання «Бігова доріжка» (#12) списано»
After a write-off no actions on the card can be done. Create a new card if the machine returned.
The system answers: «Дата виконання ТО не може бути в майбутньому»
Maintenance can be marked only for today or a past date.
The system answers: «План ТО вимкнено»
A switched-off plan does not accept execution. Switch the plan on in the card and repeat.
The system answers: «Обладнання не прив'язане до корту / доріжки — блокувати нічого»
Calendar blocking is available only for equipment linked to a court or lane. Link a court in the card or report the breakdown without a block.
The system answers: «Дата події не може бути в майбутньому»
Enter today's or a past date of the event.
The system answers: «Записати ремонт із вартістю може лише працівник з правом створювати витрати»
Your role has no right to create expenses. Leave the cost empty or ask a colleague with that right.
The system answers: «Для витрати на ремонт вкажіть підрядника (постачальника) або працівника-виконавця»
Without a payee the expense cannot be created. Choose a contractor from the directory or an employee.
The system answers: «Не задано базову валюту — витрату на ремонт створити не можна»
The base currency is not set in the system. Contact support or the owner.
The system answers: «Обладнання списано — план ТО не створюється»
Plans are not added or switched on for written-off equipment.
The system answers: «Ключ ідемпотентності вже використано для іншої дії»
A technical double-submit error. Refresh the page and repeat the action.
The system answers: «Повідомлення про поломки із застосунку вимкнено в налаштуваннях клубу»
Clients cannot report breakdowns. Switch on the rule "Equipment: a client may report a breakdown".
If a booking or class gets in the way of the court block, the system shows the same message as the calendar does for blocks. Then resolve the booking first and report the breakdown after.
Who sees it and what they can do
| Role | View | Actions |
|---|---|---|
| Owner, manager | Everything | Plans, breakdowns, repairs with a cost, maintenance, write-off |
| Senior administrator, technical staff | Cards, plans, journal | Report a breakdown, mark maintenance, record a repair without a cost |
| Others | By right | By right |
The actions "Report a breakdown", "Record a repair", "Maintenance done" and changing a plan need the change right, "Add plan" needs create, "Write off" and deleting need delete. The repair cost field also needs the right to create expenses.
Frequently asked questions
Can maintenance be counted by machine hours?
Not yet, only every N days (from 1 to 3650).
When does equipment return to In service?
After a repair is recorded with the result Repair finished. If the work continues, the status stays Under repair.
What do I enter as the cost of a warranty repair?
Leave it empty or zero: no expense is created.
How do I see who did what?
The card journal shows the performer and the date, and the CRM activity log records every action with the equipment name, amount and employee.
Is a maintenance task closed after Maintenance done?
No, not automatically. The performer closes it in Tasks themselves.
Keep reading
- Equipment care: machine cards, QR labels, search
- Equipment reports: repairs, maintenance, warranty
- Task board: hall tasks by status and deadline
- Expenses: plan, approve and pay the club's costs
- CRM system rules: cancel windows, penalties, limits
- Room, court and locker rental in the CRM: halls, hireHalls and equipment in GYMS-CRM: halls, courts and tables with per-minute rates, room rental once or as a series, equipment hire, lockers. See the screens.
- Equipment rental: towels, rackets and fees for lossHow to run rental in a club: tracking towels and rackets, issue and return, advance booking, deadlines, loss or damage fees and checking returns are in place.
- Locker rooms: issuing, renting and key controlHow to organise locker rooms: grids and lock types, automatic and manual issue, rental for a period, releasing lockers and the most common mistakes to avoid.
- Court and hall rental prices: hourly rates explainedHow to price court and hall rental: hourly rates by day and time, peak and off-peak windows, series for organisations, payment, cancellation. Worked examples.