# Club closures in the CRM: repairs, holidays, extending

> How to schedule a hall closure for repairs or a holiday, allow staff to work, extend or cancel it and what happens to the timesheet and client memberships.

- URL: https://gyms-crm.com/en/docs/workers-schedule/closures/
- Language: en
- Updated: 2026-11-16
- Site: GYMS-CRM (https://gyms-crm.com/)

Documentation menu

How to schedule a hall closure for repairs or a holiday, allow staff to work, extend or cancel it and what happens to the timesheet and client memberships.

Updated Nov 16, 2026About 5 minBeginner

For roles:OwnerAdministratorManager

**Screen overview in words**

What this page covers: Why closures · How to schedule one · Staff and the timesheet · Client memberships

A club closure is a period when the hall is shut to clients: repairs, a sanitary day, a holiday. You give the location, the dates and a reason.

One switch matters: whether staff are allowed to work. If technicians come in for the repairs, turn it on and the timesheet runs as usual. If it is off, the location's employees are not marked absent on those days.

Once a closure is active it can be extended, and one that has not started can be cancelled. Statuses change by themselves with the dates: planned, active, completed.

One reminder. A closure does not stop clients' memberships. For the closure days not to be charged, set up a mass freeze in the settings.

**On this page**

Where to find it:TeamWork scheduleClub closuresaddress: `/workers-schedule/closures`

Who it is for: a manager schedules closures, the owner watches how they show in pay.

## Why this screen matters

When the hall is shut, employees do not open shifts. Without a closure record the system would take them for absentees in the morning. A closure explains this in advance and also shows a stripe across the whole column on that day in the [Schedule](https://gyms-crm.com/en/docs/workers-schedule/schedule/) grid.

## What is on the screen

![The “Location closures” tab: dates when the location is not working](https://gyms-crm.com/docs/screens/wsched-closures.webp)

A location closure affects the schedule and the work rota.

1. 1The “New closure” button
2. 2Staff may work during the closure

The menu item and the screen heading are both “Club closures”. The page shows cards of closures with dates, the “Staff allowed to work” flag and a status. At the top are the New closure button and the total “Total: N”. Filters: All statuses, Closed now, Open, any status from the list, and Period. There is no step bar here.

## Actions on the screen

### How to schedule a closure

1. Press New closure and choose the location.
2. Set the Start date and End date. Closures of one location must not overlap.
3. Turn on Staff allowed to work if employees will come in, for example during repairs. The timesheet then runs as usual. If it is off, the location's employees are not marked absent on those days.
4. Type the reason (“Closure reason…”) and save: “Closure scheduled”.

### How to extend or cancel

Open the closure's card. While it is active, the Extend until block lets you set a new end date, no earlier than the current one, and press Save. The start date and the staff flag can be changed only before the start, while the closure is “Planned”. The Cancel button opens a “Closure cancellation” window with a confirmation. After the closure has ended, it cannot be changed.

## What this changes

- **The timesheet.** If staff are not allowed to work, nothing counts as an absence on the closure days.
- **The schedule grid.** The cells of closed days in “Schedule” are hatched.
- **Statuses.** A closure becomes active on its start day and completed after the end, even if it was entered retroactively. This happens overnight.

Client memberships

A club closure only marks a period in the staff schedule; it does not yet block clients' entry and bookings. For the closure days not to be charged against clients' memberships, set up a mass freeze for this location under [“Mass freezes”](https://gyms-crm.com/en/docs/settings/mass-freeze/).

## Typical situations

### The hall is closed for repairs, technicians work

Create a closure with “Staff allowed to work” turned on.

### The repairs dragged on

Open the active closure and extend the end date in the “Extend until” block.

### The closure was entered by mistake

Cancel it with the “Cancel” button and, if needed, create a new one with the right dates.

## When the system refuses

The system answers: «Закриття локації перетинається з існуючим #… | …»

A closure is already planned for this location on those dates. Change the dates or extend the existing one. In the form the same text reads “Overlaps with an existing closure #… | … — … | Free from: …”.

The system answers: «start_date не може бути в минулому — передано «…»»

A new closure starts no earlier than today. For past dates contact the system administrator.

The system answers: «end_date має бути пізніше або рівний start_date»

The end date cannot come before the start date. Correct the dates.

The system answers: «Неможливо змінити start_date та staff_allowed закриття #… — дозволено тільки у статусі PLANNED.»

The start and the staff flag can be changed only before the closure starts. For an active closure change only the end date.

## Who can see and do what

| Role | View | Actions |
| --- | --- | --- |
| Owner, manager | Closures | Create, extend, cancel (permission “Location Closures”) |
| Administrator | Depends on permissions | The same, if the permission is granted |
| Trainer, cashier | The section is unavailable | Nothing |

## Frequently asked questions

**Will a closure block clients' bookings?**

No. A club closure marks a period in the staff schedule, and it does not switch off client booking or entry. For memberships you need a mass freeze.

**Can I close all halls at once?**

A closure concerns one location. Create a separate closure for each hall, or enter a global “Public holiday” event in “Leave & sick days”.

**What happens if staff are allowed to work?**

The timesheet runs as usual: employees open shifts, and an unexplained absence counts as an absence.

**Can I change the closure dates?**

You extend the end date while the closure has not ended. The start date and the staff flag can be changed only before the start.

- [NextHours reports →](https://gyms-crm.com/en/docs/workers-schedule/reports/)
- [RelatedLeave and sick days](https://gyms-crm.com/en/docs/workers-schedule/events/)
- [RelatedSettings → Mass freezes](https://gyms-crm.com/en/docs/settings/mass-freeze/)

## Keep reading

- [Leave, sick days and replacements of employees](https://gyms-crm.com/en/docs/workers-schedule/events/)
- [Who is on shift: open, close and correct a shift](https://gyms-crm.com/en/docs/workers-schedule/shifts/)
- [Monthly routine: from schedule to payroll](https://gyms-crm.com/en/docs/workers-schedule/monthly-flow/)
- [Mass freeze of memberships in the CRM: repairs, holidays](https://gyms-crm.com/en/docs/settings/mass-freeze/)
- [Staff and payroll in the CRM: roles, schedules, timesheetStaff in GYMS-CRM: profiles, roles and rights, schedules and timesheets, shift reports, a payroll builder with 13 formulas, drafts, statements and tasks.](https://gyms-crm.com/en/mozhlyvosti/spivrobitnyky-ta-zarplata/)
- [Trainer app: a working day without a paper registerA trainer's day in the club app: start and finish classes, mark no-shows, answer personal requests, see clients. What works now and a sample daily routine.](https://gyms-crm.com/en/blog/coach-app-daily-workflow/)
- [Trainer pay: formulas, tiers and the payroll statementHow to set up trainer payroll in a CRM: per-class rates, tiers by headcount, percentage of revenue, salary and guaranteed minimum, draft, approval, payout.](https://gyms-crm.com/en/blog/trainer-payroll-formulas-tiers/)
- [How to calculate trainer pay: percentage, rate, mixedFour trainer pay schemes: percentage of revenue, rate per class, hourly and mixed with a guarantee. Worked examples, mistakes and automating the monthly count.](https://gyms-crm.com/en/blog/yak-rakhuvaty-zarplatu-treneram/)

[Back to all documentation](https://gyms-crm.com/en/docs/)
